LIST  OF  CLIENTS

Sr. No.
& Date

Area of Installation

Name of Client

Metering system

Voltage Level

Comm. Date

174/07

ATGAON.
23.1.08

Plus Barrels 8/6,Mehul Appartments,Nr.Jain Mandir Temple J.B.Nagar,Andheri
Mumbai – 59,For factory:at Plot No. 85,Atgaon Industrial Complex,Mumbai Agra Road,Tal: Shahpur

22 KV Power Temple CT/PT meter own  Resin Cast
Ratio = 5/5A

22 KV

Work
Completed

175/07

SOLAPUR
2.2.2008

Laxmi Drucken Komponents Pvt.Ltd
C-47/C-48,M.I.D.C. Chincholi
SOLAPUR
P.O. No. LDK/ELEC/07-08 dt 29/1/08

11 KV Power Temple with Own Resin Cast CT/PT -10/5A

11 KV

 Work completed

176/07

AMBERNATH.
16.2.2008

ACHARYA CHEMICALS
x-4,Next to Unique Automobiles
Near ICICI Bank,MIDC Phase II,Dombivali Dist: Thane

P.O. No. CPP/50006/1101 dt 2.11.08
For their Factory at W-41 & 42 MIDC Ind. Estate,Morivali Village
AMBERNATH - 421501

22 KV Power Temple
W/O

CT/PT

22 KV

Order received on 16.2.08 work in progress

177/07

PUNE.
23.2.2008

Sharp Electricals
Flat No.2,Lokesh Appartments
Telco Bhosari Road,
Yeswant Nagar,Pimpri,Pune – 411018
P.O. No. 200 dt 21`.2.08 for Hinjewadi

22 KV Power Temple with
Resin cast CT/PT – 25/5A

22 KV

Work Completed
10.5.08

178/07

PUNE.
25.2.2008

New Swati Electricals Engineer
S.No. 33/3 Omkar Park,
Phase – I,
B-6,Rajmudra Society
Dhankawadi,Pune
P.O. No. NSEE/105/FEB/

 I1 KV Power Temple with Resin Cast CT/PT

11 KV

Work completed on 3.4.2008

179/07

WADA.
26.2.2008

Sterling & Wilson Pvt.Ltd.
C/o.M/s Blue Star - Wada
Order No. 308-07/CSR /263 dt 25.2.2008

22 KV Power Temple with
Resin cast  CT/PT Ratio 25/5A

22 KV

Work completed on 25.6.08,commissioned on 20.12.08

180/07

BHIWANDI.
27.2.2008

Sakariya Synthetics Pvt.Ltd.
Bhiwandi

P.O. Verbal

22 KV Power Temple

22 KV

Completed on 29.3.08

181/07

CHAKAN.
27.2.2008

Terminal Technologies (I) Pvt.Ltd.
Gut  -312/2,Nanerkarwadi Ind.area,
Alandi Phata,CHAKAN,
Pune – 410 501
For CHAKAN Plant

33 KV Power Temple with Resin Cast CT/PT

33 KV

Completed

182/07

PUNE.
1.3.2008

RVS Hospitality & development Pvt.Ltd
94/16,Butte Patil Classic,
App: Suvarnarekha Dyning Hall
Prabhat Road
Pune – 411 004 P.o. RVSH/DPL/PIO/07/02 dt 31.1.08

11 KV Power Temple with Resin Cast CT/PT – 25/5A

11 KV

Completed

183/07

NAVI MUMBAI.
17.3.2008

Das Offshore Engg.Pvt. Ltd.

Sagar Udhay,Plot F-3,Behind Cidco Bhawan (Agroli) Belapur,Navi Mumbai – 400 614 for their Plant at:-
D-377,D-382,M.I.D.C.TTC Area,Kuksheth,Near Oil Blending Plant,, Navi Mumbai.
(old Ref. 35) New Installation

 

22 KV Power Temple with
Resin cast  CT/PT Ratio

 

22 KV

 

Completed & Commissioned  on 21.3.2008

184/08-(1)

DOMBIVALI
2.4.2008

Mahesh Textile Processors Pvt.Ltd,
Regd.Off: Shop No. 2A,Grd.Floor,20-24 Hanuman Lane,Kalbadevi,Mumbai – 400002 for their factory at:C-27/6,MIDC,Phase-I Dombivali (E),

22 KV Power Temple with
Resin cast  CT/PT -10/5A

22 KV

Completed